Archive

Illinois Department of Transportation $11 million Phase II Engineering BLA designed the roadway improvement of IL 22 from east of I-94 to west of US 41.  The two-lane roadway was widened to four lanes with a landscaped median.  The scope included reconstruction, widening, channelization, drainage, bridge removal/replacement (Middle...

Village of River Forest $1.6 million Phase I and II Engineering The Chicago Avenue corridor is home to many historical properties.  BLA designed the mile-long resurfacing which also included more than 60 ADA ramps, parking bump-outs and drainage swales.  BLA worked with the Village extensively to enhance curb...

Village of Palatine $7 million Preliminary and Final Engineering BLA has assisted Palatine with redeveloping their downtown to improve the appearance and provide enhancements for local area businesses and residents.  Streets include Palatine Road, Bothwell Street, Railroad Avenue, West Wilson Street, Brockway Street and Slade Street.  Improvements included...

DuPage County Division of Transportation $11.4 million Phase II Engineering BLA designed the widening and resurfacing of 1.7 miles of 75th Street.  A third thru lane was added to 75th Street between Woodward Avenue and Lemont Road including signal improvements at all intersecting roadways.  The Lemont Road intersection...

Village of Schaumburg $3.5 million Phase I and II Engineering This 0.50-mile reconstruction and reconfiguration project provided improved traffic flow, bicycle accommodations, parking and safety along Walnut Lane.  Seven different alternatives were developed for the roadway.  The final product included two 11-foot travel lanes, parking bump-outs and an...

Kane County Division of Transportation $40 million Phase I and II Engineering This landmark project was more than 25 years in the making from planning to approval.  A 5.5-mile corridor extending from Huntley Road to Algonquin Road (IL 62), this project created a new Fox River bridge crossing...