Archive

Village of Lombard $2.5 million Phase I and II Engineering BLA prepared the Phase I Project Development Report and the Phase II plans and specifications for the removal and replacement of the bridge carrying Hill Avenue over the East Branch DuPage River, a three-span deck slab bridge.  The...

City of Naperville Phase I and II Engineering $1.5 million BLA performed Phase I and II design services for the reconstruction of the Jefferson Avenue Bridge and adjacent roadway including a bike path across the DuPage River.  Reconstruction was necessary because of the deteriorated condition of the bridge...

Illinois Department of Transportation $8.1 million Phase II Engineering BLA provided structural design services for the reconstruction of IL 64 over the Des Plaines River.  BLA designed a three-span, seven-lane, steel beam bridge to be constructed in stages while maintaining traffic in both directions.  Bridge work also included...

Village of Lisle $1.5 million Phase I and II Engineering BLA provided complete Phase I and II design services for the reconstruction of the Short Street bridge over the East Branch of the DuPage River, a three-span deck slab bridge.  Many architectural elements were proposed for the structure...