Cermak Road Bridges

Category
Structural
About This Project

Illinois Department of Transportation

$10 million

Phase II Engineering

BLA prepared the Phase II design engineering plans for three bridge improvements along Cermak Road in the Village of Broadview. The bridges over the IHB RR/Gardner Road and 25th Avenue required superstructure replacement because of existing structural deficiencies; the bridge over Addison Creek was completely replaced.