Village of Palatine
$1.2 million
Phase II and III Engineering
The project was a combination of multiple nearby areas in the Village of Palatine requiring watermain replacement because of aging watermain infrastructure. The areas were along Rand Road/US 12, Hale Street and behind the Jewel Osco. A complex design of variable watermain elevations allowing horizontal spacing less than 10 feet and casing pipe kept the existing adjacent sewers intact and saved the Village time and money.