Village of Deerfield
$2.5 million
Preliminary and Final Engineering
Brierhill Road is a 0.75-mile, no-outlet road that was failing along with its infrastructure. The project included roadway reconstruction, a new watermain, new sanitary sewer manholes, lining of the existing sanitary system and several drainage improvements. Challenges included maintaining traffic during construction, landscaping/mature trees extending to edge of pavement, paver and exposed aggregate driveways and stabilizing a severely eroded drainageway carrying large offsite flow from Briarwood Country Club to the North Branch of the Chicago River.